A set of molding conditions, including temperature, pressure, injection, speed, time, location, measurement distance. Injection pressure, speed, low and high measurement by forming a condition and decide, injection time, cooling time from long to short, depending on the product and reduce, so prevent sticking and excessive filling.
Two, switching speed, pressure, position, adjusting the distance properly, low voltage protection must adjust good, this is not about the new model based on a slider, the mould switch mode speed not too fast, a heart pumping mode application to test its function is normal, or because of a momentary lapse, will lead to damage Dongguan injection mold.
Three, appropriate scale back pressure, pay attention to pad in 0.5CM-1.0CM, so whether the safe use of new mode or the product quality and tools are necessary.
Four, Dongguan hang on the center hole injection mold, to correct for the accurate, clamping force as the die size and projection area size and adjust. When the injection time die not because of high injection pressure and produce the burr, can gradually increase the clamping force, until no edges.
|